{"id":134401,"date":"2026-05-20T03:03:53","date_gmt":"2026-05-20T06:03:53","guid":{"rendered":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/"},"modified":"2026-05-20T03:03:57","modified_gmt":"2026-05-20T06:03:57","slug":"oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas","status":"publish","type":"post","link":"https:\/\/ubirataonline.com.br\/en\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/","title":{"rendered":"OCI Holdings breaks ground on 480MWh battery storage project in Texas"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div data-article-content=\"true\" data-testid=\"article-editor-content\">\n<div class=\"editor-img-box\" style=\"margin-left: auto; margin-right: auto; clear: both; margin-bottom: 24px;margin-bottom: 30px;; width: 728px\"><picture><\/picture>\n<div class=\"caption\">\n<p>LG Energy Solution Vertech&#8217;s Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim Cheong-ho, center, chief executive of OCI Enterprises and CPS Energy President and CEO Rudy D. Garza, fifth from left, during a groundbreaking ceremony for a major utility-scale battery storage project in Bexar County, Texas. Courtesy of OCI Holdings<\/p>\n<\/div>\n<\/div>\n<p class=\"editor-p\">OCI Holdings, the green energy and chemical conglomerate best known for producing polysilicon for solar panels, is expanding its footprint in the North American power grid. <\/p>\n<p class=\"editor-p\">The company said Wednesday that its Houston-based subsidiary, OCI Energy, has broken ground on a major utility-scale battery storage project in Bexar County, Texas, amid a broader corporate push into the North American renewable energy market.<\/p>\n<p class=\"editor-p\">The project, dubbed Alamo City, is being developed in partnership with San Antonio\u2019s municipal utility, CPS Energy. Spanning a 140,000-square-meter site, the facility will boast an output capacity of 120 megawatts and a storage capacity of 480 megawatt-hours, making it one of the more significant grid-balancing installations in the region.<\/p>\n<p class=\"editor-p\">Scheduled to begin commercial operations in 2027, the installation is engineered to discharge up to four hours of continuous backup electricity during peak demand periods \u2014 enough to supply roughly 30,000 households in the San Antonio metropolitan area.<\/p>\n<p class=\"editor-p\">Key attendees at the ceremony included Kim Cheong-ho, chief executive of OCI Enterprises, OCI Energy President Sabah Bayatli, CPS Energy President and CEO Rudy D. Garza, and Park Jae-hong, head of LG Energy Solution Vertech&#8217;s Korea operations.<\/p>\n<p class=\"editor-p\">The deal is backed by project financing from ING Capital. LG Energy Solution Vertech has been tapped to supply the battery systems, while Elgin Power Solutions will oversee engineering, procurement and construction. Under a 20-year capacity agreement, OCI will sell the stored electricity back to CPS Energy, which serves 1.28 million households across Texas and has maintained a development partnership with OCI since 2012.<\/p>\n<p class=\"editor-p\">The groundbreaking  follows a separate announcement on May 14, in which OCI Energy sold a 50 percent stake in its 500-megawatt La Salle solar project to Arava Power, an Israeli energy firm. The two companies plan to break ground on that site later this year.<\/p>\n<p class=\"editor-p\">With these latest moves, OCI Energy said it now commands a North American development pipeline of 31 projects totaling 7 gigawatts, split almost evenly between utility-scale solar and energy storage systems.<\/p>\n<p class=\"editor-p\"><em style=\"font-style:italic;\"><span style=\"color: rgb(102, 102, 102);\">This article was published with the assistance of generative AI and edited by The Korea Times.<\/span><\/em><\/p>\n<p><input type=\"hidden\" name=\"ktViewTypeBody\" value=\"NORMAL\"\/><\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/www.koreatimes.co.kr\/business\/companies\/20260520\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\">Source link <\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>LG Energy Solution Vertech&#8217;s Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim Cheong-ho, center, chief executive of OCI Enterprises and CPS Energy President and CEO Rudy D. Garza, fifth from left, during a groundbreaking ceremony for a major utility-scale battery storage project in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":134402,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"googlesitekit_rrm_CAow2JLhCw:productID":"","maa_idioma":"","maa_pais":"","footnotes":""},"categories":[1],"tags":[36973,18272,7813,12702,27769,36972,13191,9247,6388],"class_list":["post-134401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ubirata","tag-480mwh","tag-battery","tag-breaks","tag-ground","tag-holdings","tag-oci","tag-project","tag-storage","tag-texas"],"blocksy_meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.6 (Yoast SEO v27.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>OCI Holdings breaks ground on 480MWh battery storage project in Texas - Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!<\/title>\n<meta name=\"description\" content=\"LG Energy Solution Vertech&#039;s Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ubirataonline.com.br\/en\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"OCI Holdings breaks ground on 480MWh battery storage project in Texas\" \/>\n<meta property=\"og:description\" content=\"LG Energy Solution Vertech&#039;s Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ubirataonline.com.br\/en\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/\" \/>\n<meta property=\"og:site_name\" content=\"Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/portalubirataonline\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-20T06:03:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-20T06:03:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1718\" \/>\n\t<meta property=\"og:image:height\" content=\"1097\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ubirataonline\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ubirataonline\" \/>\n<meta name=\"twitter:site\" content=\"@ubirataonline\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ubirataonline\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/\"},\"author\":{\"name\":\"ubirataonline\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#\\\/schema\\\/person\\\/372f87bbd3fdd79b8556b84c98d0bc1c\"},\"headline\":\"OCI Holdings breaks ground on 480MWh battery storage project in Texas\",\"datePublished\":\"2026-05-20T06:03:53+00:00\",\"dateModified\":\"2026-05-20T06:03:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/\"},\"wordCount\":412,\"publisher\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg\",\"keywords\":[\"480MWh\",\"battery\",\"breaks\",\"Ground\",\"Holdings\",\"OCI\",\"project\",\"Storage\",\"Texas\"],\"articleSection\":[\"Ubirat\u00e3\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/\",\"name\":\"OCI Holdings breaks ground on 480MWh battery storage project in Texas - Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg\",\"datePublished\":\"2026-05-20T06:03:53+00:00\",\"dateModified\":\"2026-05-20T06:03:57+00:00\",\"description\":\"LG Energy Solution Vertech's Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg\",\"contentUrl\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg\",\"width\":1718,\"height\":1097,\"caption\":\"OCI Holdings breaks ground on 480MWh battery storage project in Texas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/ubirataonline.com.br\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"OCI Holdings breaks ground on 480MWh battery storage project in Texas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#website\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/\",\"name\":\"Ubirat\u00e3 Online Not\u00edcias\",\"description\":\"Not\u00edcias de Ubirat\u00e3, regi\u00e3o, Brasil e mundo, com informa\u00e7\u00e3o atualizada e compromisso com o leitor.\",\"publisher\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#organization\"},\"alternateName\":\"Ubirat\u00e3 Online\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ubirataonline.com.br\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#organization\",\"name\":\"Ubirat\u00e3 Online Not\u00edcias\",\"alternateName\":\"Ubirat\u00e3 Online\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/portalubirataonline\",\"https:\\\/\\\/x.com\\\/ubirataonline\",\"https:\\\/\\\/mastodon.social\\\/@ubirataonline\",\"https:\\\/\\\/www.facebook.com\\\/groups\\\/311144672285604\",\"https:\\\/\\\/www.facebook.com\\\/UBTAOnline\",\"https:\\\/\\\/www.instagram.com\\\/portalubirataonline\\\/\",\"https:\\\/\\\/twitter.com\\\/ubirataonline\"],\"description\":\"Somos um portal de not\u00edcias independente, criado em 5 de janeiro de 2009, com o objetivo de informar, conectar e valorizar a nossa comunidade de Ubirat\u00e3 e toda aregi\u00e3o. Com conte\u00fado atualizado, confi\u00e1vel e relevante, o Ubirat\u00e3 Online \u00e9 o seu espa\u00e7o para ficar por dentro dos principais acontecimentos locais, regionais, Brasil, Mundo e de interesse geral. Nosso compromisso \u00e9 com a verdade, a transpar\u00eancia e o respeito ao leitor.\",\"legalName\":\"UBIRATA ONLINE NOT\u00cdCIAS\",\"foundingDate\":\"2009-01-05\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"1\",\"maxValue\":\"10\"},\"publishingPrinciples\":\"https:\\\/\\\/ubirataonline.com.br\\\/faq\\\/\",\"address\":{\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#local-main-place-address\"},\"geo\":{\"@type\":\"GeoCoordinates\",\"latitude\":\"-24.5361401\",\"longitude\":\"-52.9921776\"},\"telephone\":[\"+5544998308235\"],\"contactPoint\":{\"@type\":\"ContactPoint\",\"email\":\"contato@ubirataonline.com.br\"},\"openingHoursSpecification\":{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"00:00\",\"closes\":\"23:59\"},\"email\":\"contato@ubirataonline.com.br\",\"vatID\":\"47.621.418\\\/0001-80\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/#\\\/schema\\\/person\\\/372f87bbd3fdd79b8556b84c98d0bc1c\",\"name\":\"ubirataonline\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/en\\\/author\\\/ubirataonline\\\/\"},{\"@type\":\"PostalAddress\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#local-main-place-address\",\"streetAddress\":\"Rua dos Coqueiros, 104 - Bairro Boa Vista, Rua dos Coqueiros, 104 Bairro Boa Vista\",\"addressLocality\":\"UBIRATA\",\"postalCode\":\"85440-000\",\"addressRegion\":\"PR\",\"addressCountry\":\"BR\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ubirataonline.com.br\\\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/logoubirataonline-1.webp\",\"contentUrl\":\"https:\\\/\\\/ubirataonline.com.br\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/logoubirataonline-1.webp\",\"width\":500,\"height\":500,\"caption\":\"Ubirat\u00e3 Online Not\u00edcias\"}]}<\/script>\n<meta name=\"geo.placename\" content=\"UBIRATA\" \/>\n<meta name=\"geo.position\" content=\"-24.5361401;-52.9921776\" \/>\n<meta name=\"geo.region\" content=\"Brazil\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"OCI Holdings breaks ground on 480MWh battery storage project in Texas - Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!","description":"LG Energy Solution Vertech's Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ubirataonline.com.br\/en\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/","og_locale":"en_US","og_type":"article","og_title":"OCI Holdings breaks ground on 480MWh battery storage project in Texas","og_description":"LG Energy Solution Vertech's Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim","og_url":"https:\/\/ubirataonline.com.br\/en\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/","og_site_name":"Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!","article_publisher":"https:\/\/www.facebook.com\/portalubirataonline","article_published_time":"2026-05-20T06:03:53+00:00","article_modified_time":"2026-05-20T06:03:57+00:00","og_image":[{"width":1718,"height":1097,"url":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg","type":"image\/jpeg"}],"author":"ubirataonline","twitter_card":"summary_large_image","twitter_creator":"@ubirataonline","twitter_site":"@ubirataonline","twitter_misc":{"Written by":"ubirataonline","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#article","isPartOf":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/"},"author":{"name":"ubirataonline","@id":"https:\/\/ubirataonline.com.br\/#\/schema\/person\/372f87bbd3fdd79b8556b84c98d0bc1c"},"headline":"OCI Holdings breaks ground on 480MWh battery storage project in Texas","datePublished":"2026-05-20T06:03:53+00:00","dateModified":"2026-05-20T06:03:57+00:00","mainEntityOfPage":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/"},"wordCount":412,"publisher":{"@id":"https:\/\/ubirataonline.com.br\/#organization"},"image":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#primaryimage"},"thumbnailUrl":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg","keywords":["480MWh","battery","breaks","Ground","Holdings","OCI","project","Storage","Texas"],"articleSection":["Ubirat\u00e3"],"inLanguage":"en-US","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/ubirataonline.com.br\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/","url":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/","name":"OCI Holdings breaks ground on 480MWh battery storage project in Texas - Ubirat\u00e3 Online Not\u00edcias - A realidade ao seu alcance!","isPartOf":{"@id":"https:\/\/ubirataonline.com.br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#primaryimage"},"image":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#primaryimage"},"thumbnailUrl":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg","datePublished":"2026-05-20T06:03:53+00:00","dateModified":"2026-05-20T06:03:57+00:00","description":"LG Energy Solution Vertech's Korea Operation Head Park Jae-hong, second from left, and OCI Energy President Sabah Bayatli, third from left, pose with Kim","breadcrumb":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#primaryimage","url":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg","contentUrl":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/05\/OCI-Holdings-breaks-ground-on-480MWh-battery-storage-project-in.jpg","width":1718,"height":1097,"caption":"OCI Holdings breaks ground on 480MWh battery storage project in Texas"},{"@type":"BreadcrumbList","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/ubirataonline.com.br\/"},{"@type":"ListItem","position":2,"name":"OCI Holdings breaks ground on 480MWh battery storage project in Texas"}]},{"@type":"WebSite","@id":"https:\/\/ubirataonline.com.br\/#website","url":"https:\/\/ubirataonline.com.br\/","name":"Ubirat\u00e3 Online Not\u00edcias","description":"Not\u00edcias de Ubirat\u00e3, regi\u00e3o, Brasil e mundo, com informa\u00e7\u00e3o atualizada e compromisso com o leitor.","publisher":{"@id":"https:\/\/ubirataonline.com.br\/#organization"},"alternateName":"Ubirat\u00e3 Online","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ubirataonline.com.br\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/ubirataonline.com.br\/#organization","name":"Ubirat\u00e3 Online Not\u00edcias","alternateName":"Ubirat\u00e3 Online","url":"https:\/\/ubirataonline.com.br\/","logo":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#local-main-organization-logo"},"image":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#local-main-organization-logo"},"sameAs":["https:\/\/www.facebook.com\/portalubirataonline","https:\/\/x.com\/ubirataonline","https:\/\/mastodon.social\/@ubirataonline","https:\/\/www.facebook.com\/groups\/311144672285604","https:\/\/www.facebook.com\/UBTAOnline","https:\/\/www.instagram.com\/portalubirataonline\/","https:\/\/twitter.com\/ubirataonline"],"description":"Somos um portal de not\u00edcias independente, criado em 5 de janeiro de 2009, com o objetivo de informar, conectar e valorizar a nossa comunidade de Ubirat\u00e3 e toda aregi\u00e3o. Com conte\u00fado atualizado, confi\u00e1vel e relevante, o Ubirat\u00e3 Online \u00e9 o seu espa\u00e7o para ficar por dentro dos principais acontecimentos locais, regionais, Brasil, Mundo e de interesse geral. Nosso compromisso \u00e9 com a verdade, a transpar\u00eancia e o respeito ao leitor.","legalName":"UBIRATA ONLINE NOT\u00cdCIAS","foundingDate":"2009-01-05","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"1","maxValue":"10"},"publishingPrinciples":"https:\/\/ubirataonline.com.br\/faq\/","address":{"@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#local-main-place-address"},"geo":{"@type":"GeoCoordinates","latitude":"-24.5361401","longitude":"-52.9921776"},"telephone":["+5544998308235"],"contactPoint":{"@type":"ContactPoint","email":"contato@ubirataonline.com.br"},"openingHoursSpecification":{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"00:00","closes":"23:59"},"email":"contato@ubirataonline.com.br","vatID":"47.621.418\/0001-80"},{"@type":"Person","@id":"https:\/\/ubirataonline.com.br\/#\/schema\/person\/372f87bbd3fdd79b8556b84c98d0bc1c","name":"ubirataonline","url":"https:\/\/ubirataonline.com.br\/en\/author\/ubirataonline\/"},{"@type":"PostalAddress","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#local-main-place-address","streetAddress":"Rua dos Coqueiros, 104 - Bairro Boa Vista, Rua dos Coqueiros, 104 Bairro Boa Vista","addressLocality":"UBIRATA","postalCode":"85440-000","addressRegion":"PR","addressCountry":"BR"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ubirataonline.com.br\/oci-holdings-breaks-ground-on-480mwh-battery-storage-project-in-texas\/#local-main-organization-logo","url":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/06\/logoubirataonline-1.webp","contentUrl":"https:\/\/ubirataonline.com.br\/wp-content\/uploads\/2026\/06\/logoubirataonline-1.webp","width":500,"height":500,"caption":"Ubirat\u00e3 Online Not\u00edcias"}]},"geo.placename":"UBIRATA","geo.position":{"lat":"-24.5361401","long":"-52.9921776"},"geo.region":"Brazil"},"_links":{"self":[{"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/posts\/134401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/comments?post=134401"}],"version-history":[{"count":0,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/posts\/134401\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/media\/134402"}],"wp:attachment":[{"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/media?parent=134401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/categories?post=134401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ubirataonline.com.br\/en\/wp-json\/wp\/v2\/tags?post=134401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}